        oh, no, it’s far worse than that. the last 90% is enough time to make what you thought was the first 90% become 10%.

        so 0.9*expected time = 0.1* actual time

        which, if you can do some very basic algebra, results in 900%. this implies that every project will seem “almost done” for about 9x the length of time you thought the project would take. in my experience, this is roughly correct

        • Johanno@feddit.de
          link
          fedilink
          arrow-up
          5
          ·
          1 year ago

          As someone who has been working on a “almost done” Task for 2 years I can confirm.